Generation - Thermal Power Plants

Beneficiary/Client

Projects

Scope

Partner

Value (EURO)

BOTOȘANI MUNICIPALITY

Implementation project at the CET Botoșani source (city)

Rehabilitation and modernization design and commissioning of:
-thermal engines MWe 4.4 / 3.5 MWt
-hot water boilers 52 MWt 120/70° C
-fire detection systems
-water treatment installations
-structural and architecture works
-buildings constructions
-hydro-technical constructions
-primary distribution switchgears
-main and secondary distribution boards
-low voltage switchboard up to 5000A, PC/MCC DISMOD type

ELSACO

14.300.000

cet botosani 01
cet botosani 02
cet botosani 03

Generation - Hydro Power Plants

Beneficiary/Client

Projects

Scope

Partner

Value (EURO)

VOITH HYDRO SRL (GROUP Voith GmbH & Co GERMANY)

Banesti - Floresti Plant modernization

Equipment installation:
-manufacturing, delivery and commissioning electrical equipments: industrial automation and control switchboards
-cables installation for command and signalling equipment
-preventive checks, relays parameterisation at three plants: Banesti, Floresti 1, Floresti 2

470.000

Hidroelectrica SA - Portile de Fier, Drobeta Turnu Severin Hydroelectric Power Plant branch

Electrical equipment for 220Vcc auxiliary services distribution - Portile de Fier I HPP
Electrical equipment for general overhaul of 220Vcc power and distribution installations - Portile de Fier I HPP

Design and commissioning:
-primary distribution switchgears
-auxiliary services cabinets for 400/230 VAC and 48

980.000

Generation - Photovoltaic Power Plant

Beneficiary/Client

Projects

Scope

Partner

Value (EURO)

MIZIL CITY

Construction and mounting of photovoltaic power plant within the “Photovoltaic power plant for the production of electrical power from the conversion of solar energy in Mizil town, Prahova county”

Electrical power plants construction works
Photovoltaic solar modules
Landscaping works
Electrical connection works

5.450.000

Distribution

Beneficiary/Client

Projects

Scope

Partner

Value (EURO)

OLTENIA ENERGY DISTRIBUTION (CEZ GROUP)

10 substations 110/20 kV upgrade

-civil works and electrical installations design
-upgrading indoor and outdoor lighting
-110/20kV power transformers auxiliary services modernization and SCADA integration
-manufacturing, delivery and commissioning electrical equipment: primary and secondary distribution switchgears; control and protection panels for 110/20(6) kV substation, 400/230Vac and 48...220Vdc auxiliary services cabinets
-cables installation for command and signalling equipment
-delivery and commissioning of arc-suppression coils and service transformers
-secondary circuits and cables installation for control and protection system

13.000.000

oltenia cez 01
oltenia cez 02
oltenia cez 03

SDEE TRANSILVANIA NORD SA (GROUP ELECTRICA)

Increase of safety and continuity of consumers' power supply from Marghita Municipality

Construction and modernization works for electrical station
Power systems design services
Manufacturing, delivery and commissioning electrical equipment: AC/DC auxiliary services cabinets; Assemblies for power distribution in public networks; Control and protection panels for high voltage electrical substation

660.000

Modernization of 110 kV/20kV station, Marghita, Bihor county

Installation works for electrical distribution systems
Manufacturing, delivery and commissioning electrical equipment: secondary distribution switchgear
Services of technical design for industrial processes and production

630.000

sdee nord marghita 01
sdee nord marghita 02
sdee nord marghita 03

Modernization of 110kV/20kV station in Aghires, Cluj county

Installation works of electrical distribution systems
Power systems design services

320.000

sdee nord arghires 01
sdee nord arghires 02
sdee nord arghires 03

Modernizations of 110/20kV Transformation Stations, Viseu Station, Maramures county and Iosia Station, Bihor county

Modernization works for Primary distribution switchboards
Design and execution for arc-suppression coil automation panels

1.060.000

SDEE TRANSILVANIA SUD SA (GROUP ELECTRICA)

Poiana Brasov 110 kV substation and upgrade to 20kV for the Poiana Brasov medium voltage power grid

-design, civil works and electrical installations, SCADA, earthworks, frames foundations, equipment, internal roads, cable channels
-delivery and commissioning of the following equipment: prefabricated concrete substations, primary and secondary distribution switchgears; control&protection panels for 110/20(6) kV substations; auxiliary services cabinets for 400/230 VAC and 48

Simens, Energomontaj

6.200.000

sdee sud poiana 01
sdee sud poiana 02
sdee sud poiana 03

RED 110 KV in RED MT SDEE Mures

Voltage increase and modernization of LEA jt area PT2, PT3, Corunca
Safety increase in the area Sg. de Mures by a 20 kv injection in the Baraj Station
Backup supply MT of 110/20 KV Raciu Station
Transformation electrical station
Safety and surveillance systems and devices
Power lines construction works
Alarm system installation works
Production, delivery and commissioning: compact transformation stations, primary distribution switchboards, AC/DC auxiliary services cabinets

2.190.000

SDEE TRANSILVANIA SUD SA (GROUP ELECTRICA)

Introducing 20kV voltage in the 110/6kV IUP Stgation, Targoviste, Dambovita county

Design works, construction works and electrical installations
Manufacturing, delivery and commissioning electrical equipment: primary distribution switchgear

92.000

Modernization of PA Mihai Bravu, Ploiesti County

Design works, construction works and electrical installations
Manufacturing, delivery and commissioning electrical equipment: primary distribution switchgear, main and secondary distribution boards

2.670.000

SAD implementation in urban areas in Focsani and Sinaia Municipalities

Design works, construction works and electrical installations
Manufacturing, delivery and commissioning electrical equipment: secondary distribution switchgear, main and secondary distribution boards, SCADA, AC/DC auxiliary services cabinets

1.420.000

DELGAZ GRID (GROUP E.ON)

Modernization and integration in SCADA systems of 26 transformation stations

SCADA or equivalent systems Electrical transformation station
Modernization of stations
Power systems design services
Integrated engineering services
Manufacturing, delivery and commissioning electrical equipment: secondary distribution switchgear
Parameter setting and configuration services for protection relays

5.800.000

delgaz botosani 01
delgaz botosani 02
delgaz botosani 03

Transmission

Beneficiar/Client

Projects

Scope

Partner

Value (EURO)

TRANSELECTRICA S.A.- Bacau Transport Branch

Modernization of 220/110kV FAI transformation station, Iasi

Modernization of 20kV FAI station
Manufacturing, delivery and commissioning electrical equipment: primary distribution switchgear, AC/DC auxiliary services cabinets, arc-suppresion coil automation panels

950.000

Focsani Vest 20 kV and services substations upgrade

-telecommunication works
-centralized metering system
-arc suppression coil automatic adjustment
-service transformers and arc-suppression coil automatic adjustment
-manufacturing, delivery and commissioning electrical equipments: prefabricated concrete substations, primary and secondary distribution switchgears; control and protection panels for 110/20(6)kV power stations; auxiliary services cabinets for 400/230 VAC and 48

2.300.000