Energy Project Package nr. 2 - Implementation of prefabricated 6/0.4kV transformer substations equipped with motor speed control and direct electric drive
-Design -Installation of prefabricated transformer substation -manufacturing, delivery and commissioning electrical
equipment: prefabricated concrete substations,
primary and secondary distribution switchgears;
main and secondary distribution boards; industrial
automation and control switchboards; low voltage
switchboard up to 5000A, PC/MCC DISMOD type
1.000.000
Construction materials
Beneficiary/Client
Projects
Scope
Partner
Value (EURO)
HEIDELBERGCEMENT ROMANIA (HeidelbergCement Group, Germany)
Bicaz Cement Plant - Modernization and commissioning of a new production line
Mounting and construction works Retrofit of medium voltage electrical cells Parameter setting for relays Accessories for medium voltage equipment Manufacturing, delivery and commissioning electrical equipment: AC/DC auxiliary services cabinets
790.000
Chemical - Pharmaceutical
Beneficiary/Client
Projects
Scope
Partner
Value (EURO)
FARMEC SA
Farmec Headquarters Power Supply - Modifying the power supply solution
Manufacturing, delivery and commissioning electrical equipment: prefabricated concrete substations; secondary distribution switchgears SCADA integration works Power supply connection works